A Professional Manufacturer with 20 Years of Expertise in Magnetic Materials

Search
  • English
  • 简体中文
  • Deutsch
  • Русский язык
  • 日本語
  • 한국어
  • HOME
  • PRODUCTS
    • >> Nanocrystalline Ribbons
    • >> Nanocrystalline Cores
    • >> Instrument Transformers
    • >> NdFeB
  • APPLICATIONS
    • >> Power and Energy
    • >> Electrical Automation and Control
    • >> Consumer Electronics and Home Appliances
    • >> Communication and Network Equipment
    • >> Specialized Technology Fields
  • ABOUT US
  • SUPPORT
    • >> FAQ
    • >> Technical Support
    • >> Customer Service
  • NEWS
    • >> Leimai News
    • >> Industry News
  • CONTACT US

NEWS

  • Leimai News

  • Industry News

  • FAQ

Contact

Advisory Hotline:

0354-5325898

  • Fax:
    +86 354-5324898
  • mailbox:
    lmkj002@leimai.tech
  • Address:
    Qincun, Xiliuzhixiang, Qixian, Jinzhong City, Shanxi Province, 030900, China
HOME  ꄲ  Installation and Inspection Steps for Voltage Transformers:

Installation and Inspection Steps for Voltage Transformers:

Created on:2025-02-20 17:02

Installation and Inspection Steps for Voltage Transformers:

  1. Inspect the porcelain bushings for any cracks, rough edges, or damage. Check if the bonding between the porcelain bushing and the top cover is secure. Gently move the bushing by hand; it should not be loose.
  2. Check the oil level indicator of the voltage transformer for blockages or oil leakage. The oil level should reach the standard height. If the oil level is too high, it could create excessive pressure inside the sealed transformer; if too low, it may cause overheating or damage to the insulating materials. The oil level should generally be 10-5mm below the oil tank cover.
  3. Check the external casing of the voltage transformer for any oil leakage. If leakage is found, the core should be lifted out, the oil should be drained, and repairs made. The valve on the oil tank should rotate smoothly when turned by hand.

 

Installation Notes for Voltage Transformers:

Voltage transformers are generally installed directly onto concrete pads, which should have adequate strength before installation. Sometimes, voltage transformers are installed inside complete switchgear sets. In such cases, only the wiring needs to be checked. When installing, the following points should be noted: During transport, the voltage transformer should not be tilted more than 15 degrees to avoid damage to the internal insulation; the busbar connected to the bushing should not apply any pulling force to the bushing to prevent damage. The voltage transformer casing must be properly grounded. Additionally, the voltage transformer must undergo a connection test before being put into operation.

Leimai's nanocrystalline magnetic cores and nanocrystalline ribbons are engineered with the highest standards of precision and reliability, making them ideal for high-performance voltage transformers. These components, with their superior insulation and low loss characteristics, ensure safe and efficient operation in transformer installations.

ꄴPrevious: null
ꄲNext: null

About Us

  • About Us

Products

  • Nanocrystalline Ribbons

  • Nanocrystalline Cores

  • Instrument Transformers

  • NdFeB

Applications

  • Power and Energy

  • Electrical Automation and Control

  • Consumer Electronics and Home Appliances

  • Communication and Network Equipment

  • Specialized Technology Fields

Services

  • FAQ
  • Technical Support
  • Customer Service

Contact Us

  • Company Name:
    Shanxi Leimai Electronic Technology Co., Ltd.
  • Tel:
    +86 3545325898
  • Fax:
    +86 354-5324898
  • Email:
    lmkj002@leimai.tech
  • Address:
    Qincun, Xiliuzhixiang, Qixian, Jinzhong City, Shanxi Province, 030900, China

Links:International Electrotechnical Commission (IEC)China Electrical Equipment Industry Association (CNEA)   The Electrical ShowPCIM Europe

 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6